Today was a perfect example of most days — things scheduled on top of things scheduled on top of things. One of these items was for roof inspection. Of course, they gave me a window of 1 pm to 5 pm. I had a conference call for work at 2:30 pm and jokingly said they’d arrive at the same time. Well, I was wrong, they actually showed up around halfway through my call. Luckily, I did not have to engage the inspectors –just having to point out the entrances to the attic. As the call was wrapping up, they told me the awesome news that our roof failed inspection. The foam material surrounding the vents is combustible. Also, not inspection related, they said our dryer vent is overflowing and that is the number one case of fires.
More has been added to the plate and nothing from the plate has been removed. I guess it is nice to get things sorted out correctly. However, couldn’t that have been done the first time around?
As I read through this, all I hear is whine, whine, whine. At least that is consistent with my current mood! Hoping the next blog will be more full of glee.
